Movement groups and goto waypoints

Posted 3 months ago by Rikke Tina Lenz

Post a topic
Un Answered
R
Rikke Tina Lenz

When using movement groups together with waypoints it seams like the functions in movement group (slowdown function) is stronger than the function waypoint. 

I would like all my small groups to meet at the waypoint not before or after - depending on the leaders walking distance to the point. Is this possible ?

(your video of two groups also have some occupants walking towards leader not the waypoint)

I am simulation an indoor playground where parents and children will meet at a meeting point instead of the parents looking for children in the play equipment. (child as leader).

I have tried different combinations of slowdown time and waiting time but it would be more realistic if the waypoint could just be strongest.

0 Votes


0 Comments

Login or Sign up to post a comment